My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-16_REVISION - M1981021
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981021
>
2007-03-16_REVISION - M1981021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:22 PM
Creation date
11/21/2007 1:56:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981021
IBM Index Class Name
Revision
Doc Date
3/16/2007
Doc Name
Recalc of Bond Amount/ Notice of Bond Increase
From
DRMS
To
International Uranium (USA) Corp.
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />WHEEL LOADER -LOAD AND CARRY WORK <br />PROJECT IDENTIFICATION <br />Task#: 003 State: Colorado ~ Permidjob#:M-1981-021 <br />Date <br />User <br />03/16/2007 County:San <br />RCO Site: West Sunday Mine <br />Agency or organization name : DRMS <br />Permit or otherjob action :TR-3 Reclamation <br />Task description :Place low grade stockpile underground <br />HOURLY EQUIPMENT COST Basic machine:CAT 906 Horsepower: 60 <br />Attachment no. 1 : ROPS Cab Shik basis : 1 per day <br />Cost Breakdown : Ownership costlhour <br />MATERIAL QUANTITIES <br />Initial <br />volume: 3,000 LCY <br />Opeating cosVhour <br />Operator cosVhour <br />Total unit cost/hour <br /> Utilization <br />$7.99 NA <br />$13.92 100 <br />$32.78 NA <br />$54.70 Total Fleet cost/hour <br />$sa. ~o <br />Swell Final <br />factor NA volume: 3,000 LCY <br />Source of quantity take-off : TR-3 map <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION (Cat HB) <br />Loader Cvcle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.450 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material: Materia/3/4"to 6"diameter 0.000 (Cat HB) <br />Stockpile : No adjustment-factor not applicable 0.000 (Cat He) <br />Truck ownership : No adjustment-factor not applicable 0.000 (Cat HB) <br />Operation : No adjustment -factor not applicable ~ 0.000 (Cat HB) <br />Dump target: NO adjustment-factornot applicable 0.000 (Cat HB) <br />Net cycle time adjustment <br />Adjusted basic cycle time <br />Rollins Resistance -Road Conditions <br />Haul :Rutted dirt, little maintenance, no water, 2"fire <br />Data source : (CRG) <br />0.000 minutes <br />0.450 minutes <br />Retum :Rutted dirt, little maintenance, no water, 2"fire penetration <br />Haul and Retum Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 500 0.00 5.00 5.00 0.3527 (Cat HB) <br />Return route : 500 0.00 5.00 5.00 0.3527 (Cat HB) <br />Total travel time: 0.7054 minutes <br />Loader Bucket Caoacirv Total cycle time : 1.155 minutes <br />Rated capacity: 1.05 LCV (heaped) (Cat HB) <br />Bucket fll factor: 0.875 Blasted rock-well blasted (80-95%) <br />Adjusted capacity: 0.92 LCY <br />Source <br />Job Condition Correction Factors Altitude adjustment factor : 0.81 (Cat HB) <br />Site altitude: 5,800 feet Job effciency factor 0.83 (l shi#/day) <br />Net correction : 0.67 multiplier <br />Unadjusted hourly unit production: 47.71 LCV/Hr <br />Adjusted hourly unit production : 32.08 LCY/Hr (Cat HB) <br />Adjusted hourly Fleet production : 32.08 LCY/Hr <br />JOB TIME AND COST <br />Fleet size : 1 Loader(s) Total job time : 93.53 Hours <br />Abbreviation :none <br />Filename : Mo21-003 <br />Unit cost: $1.705 /LCY Totaljob cost: $5,776 <br />
The URL can be used to link to this page
Your browser does not support the video tag.