Laserfiche WebLink
requirements for the type of reclamation proposed to be implemented by you. Reclamation shall be required on <br />all the affected land. The Reclamation Plans shall include: <br />(a) A description of the type(s) of reclamation you propose to achieve in the reclamation of the <br />affected land, why each was chosen, the amount of acreage accorded to each, and a general discussion of <br />methods of reclamation as related to the mechanics of earthmoving; <br />(b) A comparison of the proposed post-mining land use to other land uses in the vicinity and to <br />adopted state and local land use plans and programs. In those instances where the post-mining land use is for <br />industrial, residential, or commercial purposes and such use is not reasonably assured, a plan for revegetation <br />shall be submitted. Appropriate evidence supporting such reasonable assurance shall be submitted; <br />(c) A description of how the Reclamation Plan will be implemented to meet each applicable <br />requirement of Section 3.1; <br />(d) Where applicable, plans for topsoil segregation, preservation, and replacement; for stabilization, <br />compaction, and grading of spoil; and for revegetation. The revegetation plan shall contain a list of the preferred <br />species of grass, legumes, forbs, shrubs or trees to be planted, the method and rates of seeding and planting, the <br />estimated availability of viable seeds in sufficient quantities of the species proposed to be used, and the proposed <br />time of seeding and planting; <br />(e) A plan or schedule indicating how and when reclamation will be implemented. Such plan of <br />schedule shall not be tied to any specific date but shall be tied to implementation or completion of different <br />stages of the mining operation as described in Subparagraph 6.4.4(1)(e). The plan or schedule shall include: <br />(i) An estimate of the periods of time which will be required for the various stages or <br />phases of reclamation; <br />(ii) A description of the size and location of each area to be reclaimed doting each phase; <br />and <br />out. <br />(iii) An outline of the sequence in which each stage or phase of reclamation will be carried <br />(The schedule need not be separate and distinct from the Reclamation Plan, but may be incorporated therein.) <br />(f) A description of each of the following: <br />planting; <br />(i) Final grading -specify maximum anticipated slope gradient or expected ranges thereof; <br />(ii) Seeding -specify types, mixtures, quantities, and expected time(s) of seeding and <br />(iii) fertilization - if applicable, specify types, mixtures, quantities and time of application; <br />(iv) Revegetation -specify types of trees, shrubs, etc., quantities, size and location; and <br />(v) Topsoiling -specify anticipated minimum depth or range of depths for those azeas <br />where topsoil will be replaced. <br />F.XR7RiT G _ Wsfer i»fnrmaHnn nle 6A.T (1) If the operation is not expected to directly affect <br />surface or groundwater systems, a statement of that expectation shall be submitted. <br />