Laserfiche WebLink
RECLAMATION COSTS <br />Exhibit L -AMENDMENT <br />Reclamation Costs <br />The following three pages contain the estimated reclamation costs based upon an assumed <br />worst case situation. This worst case situation is based on an assumption that reclamation will be <br />ongoing. This means that at some times the amount of reclamation needed will be less than the worst <br />case but at other times will approximate the worst case condition. <br />The calculated bond amount, with Division add-ons, is $49,877.78. This amount is not in addition to <br />the current bond, but in place of the current bond. <br />Miller Gravel Pit Amendment (2D07) Exhibit L Page 1 <br />