My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-04-23_REVISION - M2000158 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000158
>
2001-04-23_REVISION - M2000158 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:56:50 PM
Creation date
11/21/2007 1:54:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000158
IBM Index Class Name
Revision
Doc Date
4/23/2001
Doc Name
TR TO S&H MINE 112 APPLICATION PLATTE SAND AND GRAVEL LLC FN M-2000-158 RESPONSE TO HYDROLOGIC
From
PICKETT ENGINEERING INC
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />located along the western and southern edge of the proposed lakes. This slope protection <br />(riprap) is intended to be installed during mine operations only. The riprap protection would <br />be installed during the mining operation and it is intended that no more than 500 feet of <br />completed mined slope edge be allowed to remain unprotected at any one time. Once the <br />mine operations are complete and mitigation procedures begin, it is intended for this riprap <br />protection to remain in place as indicated on the enclosed cross-section titled "Lake Slope <br />Protection." <br />3. The cost of this mitigation is estimated below. It is estimated that the riverbank armor will <br />utilize approximately six tons of material per linear feet. We estimate the cost at $3 per Yon <br />or $18 per lineaz foot. Again, this armoring is optional but if the entire length were armored <br />we estimated 20,000 linear feet or $360,000. Likewise the lake slope protection azea is <br />estimated to require about 4 %: tons of material per lineaz foot. At $3 per ton this would cost <br />$13.50 per lineaz foot. We estimate currently that there is 22,000 linear feet of protection <br />required for a cost of $297,000. Both of these are total maximum project costs. <br />4. Describe when during the mining and reclamation sequence that this specified mitigation <br />procedures will be employed: As previously described, the riverbank armoring should be <br />applied, if the applicant desires to maintain the current location of the river and/or when <br />mining operations or other requirements of the applicant require that the applicant armor the <br />river. The lake slope protection will occur during mining operations. Once the mining <br />operations have reached the point of the extremity of the lake, in the azea so highlighted on <br />the enclosed map, these azeas will be armored at that time. No more than 500 linear feet of <br />bank will remain unprotected for a continuous operation. If mining operations cease along <br />the bank edge this protection should be placed within ninety days of cessation of mining <br />operations along the edge regardless of the length. <br />Please do not hesitate to contact me if you need further information. <br />Sincerely, <br />PICKETi ENGINEERING, INC. <br />/'~^~ <br />Kris- i/cke~tt, P-E- <br />rPresiaent <br />KAP/jz <br />cc: Clerk to the Board, Board of County Commissioners <br />Weld County Planning <br />Platte Sand and Cnavel, LLC <br />Steve O'Brian, Environment, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.