Laserfiche WebLink
III IIIIIIIIIiIII III <br />999 <br />DEPARTMENT OF NATURAL RESOURCES <br />David H. Getchea, Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />Richartl D. Lamm <br />Governor <br />August 10, 1984 <br />T0: Enforcement Fi. Trinidad Basin Mine <br />FROM: David C. ShelkoQ~ <br />SUBJECT: Proposed Civil Penalty for C.O. No. C-84=i 38 <br />File No. C-048-81 <br />Cessation Order No. C-84-138 was written for failure to abate NOV No. <br />C-84-072. The NOV was written for failure to certify sediment ponds. <br />The C.O. was issued to the operator on June 28, 1984. At this writing, <br />the C.O. remains unabated. Therefore, the penalty is assessed for the <br />maximum number of days which is 30. <br />$750.00/day x 30 days = $22,500.00 <br />/mab <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (30'x) 866-3567 <br />