Laserfiche WebLink
Ms. Erica Crosby <br />October 13, 1997 <br />Page 3 <br />Water quality samples were obtained for the discharge that passed <br />through the emergency spillway and for the discharge that <br />occurred immediately after the primary spillway was initially <br />unplugged. Unfortunately, we do not have any of those results at <br />the present time. <br />Based on the information provided, Seneca believes that this NOV <br />should be vacated. The amount of precipitation received exceeded <br />the design amount, and that the pond and emergency spillway <br />performed the way they were designed to. <br />Please contact me if you or any other members of the Division <br />have any questions regarding this information. <br />Sincerely, <br />~~i~.Q.~'1. ~~~~~a~c~-~- <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />c: Gary Wendt (PWCC) <br />