Laserfiche WebLink
Agency or organization name :DMG <br />Permit or other job action :Routine Bond Recalculation <br />Task description :Rep18C@ fOpS01/ Oh dlSfUfbBd 8YB8 OUf51d@ <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D7R Series 11 - 7SU Horsepower : 240 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosVhour : $40.61 NA <br />Operating cost/hour : $50.22 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cosUhour : $31.76 NA <br />Total unit cosUhour : $122.59 Total fleet cosUhour : $122,59 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 1,400 LCY factor : NA volume: 1,400 LCY <br />Source of estimated volume :2.6 acres covered with <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,022.9 LCY/hr <br />Material consistency description <br />Loose stockoile <br />Average push gradient : 0.00 % (I <br />Average site altitude : 4,730 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : :40.160 /LCY <br />avg. 4 inches of topsoil <br />dition Correction Factors <br />Source <br />Operator skill : 0.75 <br />Material consistency : 1.20 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 0.75 <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />768.60 LCY/hr <br />768.60 LCY/hr <br />1.82 Hours <br />