My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-02-23_REVISION - M1986002
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986002
>
2005-02-23_REVISION - M1986002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:42 AM
Creation date
11/21/2007 1:51:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986002
IBM Index Class Name
Revision
Doc Date
2/23/2005
Doc Name
Routine Bond Recalculation
From
DMG
To
File
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
User : SSS Abbreviation : none State :Colorado <br /> ~rv.,/ Filename : M002-000 County :Mesa <br /> Agency or organization name :DMG ~ <br /> Permit or job action :Routine Bond Recalculation ~~ - ~ ~ <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />Ol a -Backfill maximum 350' L highlNal/ dozer 1 2.5 $313 <br />02a -Replace remaining overburden on pit floor around quarry dozer 1 9.9 $1,228 <br />03a -Haul topsoil from stockpile to pit floor loader 1 21.4 $1,183 <br />04a -Spread topsoil-piles dozer 2 223.0 $223 <br />05a -Revegetate disturbed areas around quarry revege 2 24.0 $3,238 <br />O6a -Transport reclamation equipment to/from site mobilize 4 2.7 $1,163 <br />inGudes inflation factor atljustment or: NA <br />suarorALS: 283.8 $7, <br />TOTAL DIRECT COST • _ ~ a~~ <br />OVERHEAD AND PROFIT - Liability InSUranCe : 1.55 % Of d/reCt total = $114 <br />Performance bond : 1.05 % of direct total = $77 <br />Job superintendent : NA" NA NA total = NA <br />Profit : 10.00 % of direct total = $735 <br />"nof required (or eqp. operator serves a:: super) TOTAL O & P = $926 <br />LEGAL•ENGINEERING -PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+08P)= $8,274 <br />Financial warranty processing (legal/related costs) : total = <br />Engineering work and/or coritracUbid preparation : NA NA NA total = NA <br />Reclamation management amd/or administration : 5.00 % of cntr. NA total = $414 <br />CONTINGENCY- NA" NA total = NA <br />'contingencies accounted for of task level TOTAL INDIRECT COST= $1,340 <br /> TOTAL BOND AMOUNT (direct + indirect) _ $8,688 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.