Laserfiche WebLink
CIRCES Cost Estimating Software <br />WHEEL LOADER -LOAD AND CARRY WORK <br />PROJECT IDENTIFICATION <br />cask n : 02a <br />Date : 10/07/2004 <br />User: RCO <br />Stale :Colorado <br />County : La Plata <br />Site : Sandco Pit <br />Agency or organization name :OMG <br />Permit or other job action : Amentlmenf 1 <br />Task description :Load topsoil for hauling to pond banks <br />HOURLY EQUIPMENT COST Basic machine:CAT966G Horsepower- 235 <br />Attachment no. 1 : ROPS Cab Shift basis : 7 per day <br />Data source: (CRG) <br />Utilization % <br />Cost Breakdown : Ownership cosVhour : $30.54 NA <br />Operating cest/hour: $14.10 50 <br />Operator COSt/hour: $30.65 NA <br />Total unit cosUhour: $75.28 Total fleet cosVhour: $75.28 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume: 2,200 LCY factor: NA <br />Source of quantity take-off : Ap{ <br />Source of estimated swell factor : NA <br />PermiUjob n : M-1987-064 <br />Abbreviation :none <br />Filename : M064-02a <br />Final <br />volume: 2,200 LCV <br />HOURLY PRODUCTION (Cat HB) <br />Loatler Cycle Time Unadjusted basic cycle time (loatl, tlump, maneuver) : 0.500 minutes <br />Cycle Time Factors Factor(min.) Source <br />Material : Material3/4' fo 6' diameter 0.000 (Cat HB) <br />Stockpile: COnveyor or tlozerpiled loft high or less 0.070 (Cai HB) <br />Truck ownership : No atljusfinent - /actor not applicable 0.000 (Caf HB) <br />Operation : lnconsisfent operation 0.040 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br />Net cycle time adjustment: 0.050 minutes <br />Adjusted basic cycle time: 0.550 minutes <br />Rollins Resistance -Road Contlitions <br />Haul :Ruffed dirt, little maintenance, no water, 2' fire penetration <br />Return :Rutted dirt, little maintenance, no wafer 2" fire penetration <br />Haul and Return Time Length <br />(feeq Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 30 0.00 5.00 5.00 0.0667 (Cat HB) <br />Retum route : 30 0.00 5.00 5.00 0.0622 (Caf HB) <br />Total travel time : 0.1289 minutes <br />Loatler Bucket Caoacity Total cycle time : 0.879 minutes <br />Ratetl capacity: 4.75 LCV (heapetl) (Caf HB) <br />Bucket till factor. 1.100 Ofher- rock/dirt miMUres (100-720%) <br />Adjusted capacity: 5.23 LCv <br />Job Condition Correction Factors <br />Site altitude: 6,580 feet <br />Source <br />Altitutle adjustment factor 0.92 (Caf HB) <br />Job efficiency factor: 0.83 (7 shilUday) <br />Net correction: 0.76 multiplier <br />Unadjusted hourly unit production: 461.78 LCYMr <br />Adjusted hourly unit production: 352.67 LCVMr <br />Adjusted hourly fleet production : 352.51 LCV/Hr <br />JOB TIME AND COST <br />Fleet size: / Loader(s) <br />Unit cost: $0.274 /LCY <br />(Cat HB) <br />Total job time : 6.24 Hours <br />Total job cost : $470 <br />