Laserfiche WebLink
,' <br />• _ _ • iii iilr~iiinrii iii <br />~E-, <br />`^~ ~~= - •- ~ -n z•~ SNOWMASS COAL COMPANY <br />-rnnY ~) ~3a~ <br />P.O. Box 1354 <br />I~I~~1~rnL".Nv Palisade, Colorado 81526 <br />RECLAPAATiO+J UiU(SIOn7 (3031464-7951 <br />hla~- ti , 1988 <br />Sandy Marek <br />Colorado Uepartment of 1lealth <br />Water (duality Control Uisision <br />4210 East 11th Ase m]e <br />llem-er, CO 80220 <br />Re: Snowmass Coal Compan>- <br />CUPS Permit. No. CO-0029599 <br />Notice of Nonr_ompl.iance <br />Uear h1s , Marek <br />On April 29th, Ginned' Torrez c+as not.it'ied by Snowmass that <br />seepage from the general sicinity of the No. 1 Kline portal area <br />was surt'aci.ng along North 'Thompson Creels and running directly <br />into the creek. Although Snowmass c+as uncertain of its respon- <br />sibility- in this matter, steps were immediately taken to deter- <br />mine the source of the seeps and to intercept r.he water before it <br />flowed into North Thompson Creek. <br />Some background information on this matter may- assist. ~-ou in Four <br />review of this situation. During Mai- 1.9$6 Snowmass had a noncom- <br />pliance discharge from out.fall 001. This noncompliance discharge <br />C P.SlII t. P_d in Snowmass heine issued a Notice of l'i ola t.ion and Cease <br />and Desist Order Dated ,lugust 1, 1986. This Notice of 1'iolat.ion <br />and Cease and Desist Order and hlined Land Reclamation Uisision's <br />Nnt..i.r_e of ~iolat.inn were both settled b~- and Agreement., St.ipula- <br />t.ion and Order which ~:as exer,uted during December 1986 and <br />January ]987. As part of the settlement agreement Snowmass <br />agreed to redesign the seals for the No. ] Kline. 'l'he seals c:ere <br />t.o be designed to present leakage or flow of water from under- <br />¢round to the surface through the pnrt.aLs and were to be in- <br />stalled in accordance with designs and plans approsed by MLRD as <br />a revision to Snowmass' hlining Fermit. <br />By letter dated October 5, 1987, Sno~:mass requested a modifica- <br />tion to its CDFS Fermit to eliminate discharge point, OU1 beCaUSe <br />the design of water tight. seals for the No. 1 Kline was approved <br />by MLRD on Pla~• 28, 1987 and i.nstaLlation of the seals i:as com- <br />pleted in .h11y 1987. Snowmass subsequently received approval <br />from the Department of Health to eliminate discharge point 0111. <br />