Laserfiche WebLink
o- ~ .::r, 1 <br />' SW,ENT OF r U. S. DEPT. OF THE INTERIOR <br />o < ~m <br />a OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT <br />~, ~ _: ,, ~ Mine-Site Evaluation Inspection Report <br />ACM ~ •0 <br /> <br />~ 10. Type <br />1. Permi[tee/Person 9. Permit Number a. Permit b. RA <br /> RIMROCK COAL CO. C-074-89 PY aS <br /> 2. Address 11. Inspection Date 12. Inspection Type 13. Joint Inspection <br /> <br /> 1350 17TH ST., SUITE #350 03/30/95 ~ ~V Y/N <br /> MM OD YY <br />3. City 4. State 14. Petmit Status 15. Site Status 16. Facility Type <br />DENVER CO a P1 A~ <br />5. Zip Code 6. Phone Number 17. OSM Office # ] 8. RSI # 19. Land Code <br />[0202 -~ 303-534-3348 020 126 <br />7. Operator if Different than Permi ttee 20. M.S.H.A. ID # 21. State Code 22. County Code <br /> <br /> LANDMARK RECLAMATION D 08 071 <br /> 8. Mine Name 23. AVS Permittee Entity ID Number 236. State Office <br /> ~IMROCK 104711 <br />24. Performance Standard Categories <br />Codes: 1=Com liance 2=Noncom liance 3=Not Planned 4=Not Started 5=Noncom liance Identified Elsewhere <br />A. Administrative D. Backfdling & Grading H. 3 Subsidence Control Plan <br />1. 1 Mining within Valid Permit 1. 1 Exposed Openings I. Roads <br />2. 1 Mining within Bonded Area 2. 1 Contemporaneous Reclamation I. 3 Road Consuuction <br />3. 1 Terms & Conditions of Perm it 3. 1 Approximate Original Contour 2. I Certification <br />4. 2 Liability Insurance 4. 1 Highwall Elimination 3. 1 Drainage <br />5. 5 Ownership and Control 5. 3 Steep Slopes (includes downslope) 4. 1 Surfacing and Maintenance <br />6. 3 Temporary Cessation 6.~Handling of Acid & Toxic Materials 5. 4 Reclamation <br />B. Hydrologic Balance ~• 1 Stabilization (rills and gullies) <br />1. 1 Drainage Control E. Excess Spoil Disposal J. Signs & Markers <br />2. 1 Inspections ~ Certifications 1. 3 Placement 1. 1 Signs <br />3. 1 Siltation Swctures 2. 3 Drainage Control 2. 1 Markers <br />4. 1 Discharge Structures 3. 3 Surface Stabilization K. 1 Distance Prohibitions <br />5. 1 Diversions 4. 3 Inspections & Certifications <br />6. l EfFluent Limits L. Revegetation <br />7.~GroundWaterMonitoring F. Coal Mine Waste ]. 1 Vegetative Cover <br />8. 1 Surface Water Monitoring (Refuse Piles/Impoundments) 2. 1 Timing <br />9.~Drainage -- Acid-Toxic Materials I. 3 Drainage Control <br />]0. 1 Impoundments 2. 3 Surface Stabilization M. 1 Postmining Land Use <br />11.3 Stream Buffer Zones 3. 3 Placement <br /> 4. 3 Inspections and Certifications N. Other <br />C. Topsoil & SubsoB S.~Impounding Swctures <br />? I) p7PROVD)ENTLY ISSUED PERMIT <br />l.~Removal G. Use of Explosives <br />2. 3 Substitute Materials l.~Blaster Certification <br />2) <br />3.~Storage and Protection 2. 3 Distance Prohibitions - <br />4. 1 Redistribution 3.~Blast Survey/Schedule <br />-3) <br /> 4. 3 Warnings & Records <br /> S.~Control of Adverse Effects <br />25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br />a. Date of last <br />State Complete OU27/95 <br />ins <br />eclbn <br /> <br />Permit Review <br />8 <br />0 a <br />~ <br /> <br />38 <br />0 <br />~ a. Total <br />bonded <br />p . <br />. . Permitted <br />38'~ a <br />Frequency for previous 4 Calendar Qlrs. b. Phase I . <br />b. Numher of Numberd <br />aired cam a <br />complete ^4 inspeUians ^4 8.0 b. Inspection Time 6.2 released <br />7.1 b. Disturbed <br />inspections conducted <br />8 <br />~ <br />0 <br />~ c. Phaze 11 (Estimated) <br />c. Number of Number of c. Travel Time <br />' • released <br />r~u~ ^ Pam ^ <br />partial , g uvspections $ ~ <br />6.0 d <br />n Writin <br />R <br />o <br />~•~ <br />C~ d. Phase III <br />l <br />d <br />Page 1 of G <br />mspeclions conducted e <br />. <br />P <br />8 ease <br />re u.amra tiwr <br />