My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-08-20_REVISION - M1980037HR
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980037
>
2003-08-20_REVISION - M1980037HR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:56:50 PM
Creation date
11/21/2007 1:46:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980037HR
IBM Index Class Name
Revision
Doc Date
8/20/2003
Doc Name
Technical Revision Approval
From
DMG
To
TM Russell & R. C. Barger
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ao~ <br />CIRCES Cost Estimatinst Software <br /> <br />i/ <br />PROJECT IDENTIFICATION <br />Date : 11-Aug-2003 Permit or job no.: M-1980-037 Site : Ingleside Quarry <br />User : TAS Abbreviation : none State : Colorado <br /> Filename : M037-000 County : Lorimer <br />Agency or organization name :Division Of Minerals & Geology <br /> Permit or job action :Final Reclamation <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Spread soil over highwall benches NA 1 1.0 $222 <br />002 -Reclaim highwall outslopes NA 1 1.0 $565 <br />003 -Drill & Blasting (12001inearfeet) NA 1 1.0 $15,000 <br />004 -Backfill 8 regrade 11,112 cy of blasted rubble NA 1 1.0 $11,112 <br />005 Reclaim 10 disturbed surface acres NA 1 1.0 $10,000 <br />006 -Mob/Demob reclamation equipment NA 1 1.0 $3,000 <br /> SUBTOTALS: 6.00 $39,899 <br />' inGudes inflation factor adjustment of: NA % TOTAL DIRECT COST `- $39,899 <br />s' ... •' ~::: .:~ <br />:CT COSTS .:.. ~ :: . . <br />OVERHEAD AND PROFIT - LIab1111y IDSUranCe : 1.55 % Of direCl total = $618 <br />Performance bond : 1.05 % of direct total = $419 <br />Job superintendent : 3.00 hrs'...$/hr.• $35.00 total = $105 <br />Profit : 10.00 % of direct total = $3,990 <br />'assume nethours = W% of task hours TOTAL O & P = $5,132 <br />LEGAL -ENGINEERING -PROJECT MANAGEMENT- CONTRACT AMOUNT (direct i O & P) _ $45,031 <br />Financial warranty processing (legal/related costs) : total = <br />Engineering work and/or contracUbid preparation : 4.25 % of cntr. NA total = $1,914 <br />Reclamation management andfor administration : 5.00 % of cntr. NA total = $2,252 <br />CONTINGENCY- NA' NA total= NA <br />'cona'ngencles accounted for at task level - TOTAL INDIRECT COST= $9,298 <br />TOTAL BOND AMOUNT (direct + indirect) _ $49,197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.