Laserfiche WebLink
7. Monitoring Reclamation Success <br />Monitoring the reclamation on an ongoing basis will allow minor revisions to assure successful <br />reclamation. The operator plans to use the Shawano NRCS office to assist in determining the ability <br />of the reclaimed land to control erosion. If minor changes or modifications are needed to the seeding <br />and reclamation plan, revision plans will be submitted to the DMG as required. It is hoped that the <br />DMG will provide assistance in evaluating the success of the ongoing reclamation process. All areas <br />disturbed and reclaimed and any other important items regarding the reclamation will be submitted in <br />the annual reports to the DMG. <br />Haldorson Sand and Gravel Mine 30 <br />