Laserfiche WebLink
Map F shows all the final contours and reclamation Phases planned for the site. As stated in the <br />mining plan, the access roads from 6175 Road and 6200 Road will be left in order to have access to <br />the reclaimed azea. Map C-3 shows the cross-sections of the reclaimed terrain compared with the <br />original and the mining ten•ain. As seen on the cross section, 2.3 feet (1.8 feet of overburden and 0.5 <br />feet of topsoil) will be used as fill above the mining contours. <br />Haldorson Sand and Gravel Mine 23 <br />