My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-02-20_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-02-20_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:50 PM
Creation date
11/21/2007 1:44:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
2/20/2003
Doc Name
Construction Submittals
From
CC & V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO llSA 80228 <br />Telephone (303) 980-0540 <br />Fax (303) 985-2080 <br />November 6, 2002 <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, Colorado 80860 <br />Attention: Mr. Ron Roberts <br />RE: PFIASE IVA PIPE INSTALLATION <br />Dear Ron: <br />~~ -Golder <br />Associates <br />Our Ref: 003-2203 <br />Golder Associates Inc. (Golder) has prepared this letter for the Cripple Creek & Victor Gold Mining <br />Company (CC&V) documenting the installation of a solution collection pipe within the Phase 1Va <br />area. <br />On October 12, 2002 Ames Construction, Inc, (Ames) was directed to install an 8-inch N-12 PCPE <br />pipe at the northern end of the Phase IVa azea near the toe of the existing Phase IVa haul road. <br />CC&V requested that Golder observe construction activities to assure that all the pertinent Drain <br />Cover Fill (DCF) and Geomembrane specifcations were followed during the installation of the pipe. <br />Golder observed the excavation of a 6-inch deep by 1-foot wide trench into the DCF in which the <br />8-inch N-12 PCPE pipe was placed. The pipe was then covered by the DCF that was removed from <br />the trench and a layer of ore. Golder observed the construction activities full time for adherence to <br />the project specifications..Construction was conducted according to specifications and no damage to <br />the liner was observed. <br />Golder appreciates the opportunity to provide ongoing CQA services for the Cresson Project. Please <br />contact the undersigned with any questions. <br />Sincerely, <br />GOLDER ASSOCIATES INC. <br />John F. Lupo, PhD., P.E. <br />Sr. Project Manager <br />JFL/dls <br />Io\00\2203\0100\W32203 0100.05453.doc <br />cc: Bob Nichols <br />Kim Morrison <br />,r <br />i <br />,~ <br />OFFICES ACROSS ASIA; AUSTRALASIA, EUROPE, NORTH AMERICA, SOVTH AMERICA <br />
The URL can be used to link to this page
Your browser does not support the video tag.