Laserfiche WebLink
C ~ Cripple Creek & Victor Gold Mining Company <br />A Joint Venture - ANGLOGOLD (COLORADO) CORP., Manager <br />lJ~.~ Operations Office <br />P.O. Box 191 • 100 North 3rd Street <br />Victor, Colorado 80860 <br />(719) 689-2977 • Fax (719) 6893254 <br />Sent Certified Return Receipt Requested <br />7001 1140 0000 7949 2906 <br />REGEtVED <br />Febmary 19, 2003 <br />FEB 2 0.2003 <br />Mr. Berhan Keffelew <br />Senior Environmental Protection Specialist Division of Minerals and Geology <br />Colorado Department of Natural Resources <br />Division of Minerals and Geology <br />Office of Mined Land Reclamation <br /> <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Cresson Project: Phase IV Valley Leach Facility Construction Submittals <br />Dear Mr. Keffelew: <br />Enclosed aze several construction submittals that we have previously discussed and also <br />reviewed in the field. The submittals aze provided for your files as follows: <br />• Golder Associates letter dated January 29, 2003, Phase IVb Solution Collection ~~ <br />Pipe Installation. This letter addresses two areas in Phase IVb where solution <br />collection piping is not needed, as previously field approved by the Division of <br />Minerals and Geology. <br />• Phase IV PSSA Riser Section and Details Rev 4, Januazy 10, 2003 and Riser Pipe ~ <br />Details Rev 0, January 10, 2003. These drawings detail the installation of four <br />pump risers in the Phase IV PSSA. <br />• Golder Associates 2002 ADR Area Construction Quality Assurance (CQA) ~ <br />Monitoring Report dated January 9, 2003. This report addresses the additional <br />liner installed near the ADR to enhance secondary containment in that azea. <br />• Phase IVc Site Survey Control Plan, Rev 4, November 6, 2002. This drawing ~ <br />shows minor grading changes as previously discussed in the field. <br />• The Rock Drain near Phase IVb Sump is addressed in a letter from Golder / <br />Associates dated November 7, 2002, as previously approved by DMG in the field <br />at the time of construction. <br />Permit a~ -~Q,~~ ~r(~J, Confidental?: <br />Class: ~~ Type-Seq.: <br />From: To: <br />Doc. Name: `~ S <br />Doc. Date (if no date stamp): <br />