Laserfiche WebLink
1 <br />91 <br /> 1 th <br />t <br />ld <br />i <br />i <br /> a <br />a go <br />m <br />n <br />ng operation which has projections <br /> 2 of some $200 million in gold production over the <br /> 3 life of the project should be expected to assume its <br />' 4 own responsibilities of reclamation as threshold <br /> 5 criteria for its operation. <br />' 6 We will ask for the denial of this <br /> 7 permit until these criteria and the other issues we <br /> 8 t t <br />d <br />h <br />b <br />d <br />t <br /> presen <br />een a <br />o <br />ay <br />ave <br />equa <br />ely addressed. <br />' 9 Thank you. <br /> 10 THE CHAIRMAN: Thank you. The first <br /> 11 issue that we would like to address is water sources <br /> 12 and Steve asked if he could come up here artid take <br /> 13 the witness chair. Let me make a few preliminary <br /> 14 remarks about this issue and then turn this over to <br />t 15 <br /> Steve. <br /> 16 Exhibit G in Battle Mountain's <br /> 17 application attempts to address the water sources <br /> 18 that will be used by Battle Mountain to satisfy the <br /> 19 water requirements. And as the Board knows; its <br />' 20 rule, Rule 2.1.2 sub 8, requires the following. Let <br /> 21 me read this to you because I think it's very <br /> 22 important: <br /> 23 The operator shall indicate the water <br /> 24 rights and the sources of water supplied for project <br /> 25 water requirements. Sources of water shall be <br />t AGREN, BLANDO & BILLINGS <br />~1 <br />W <br />