Laserfiche WebLink
~ ~~~ ~~~~~~~~~~~~~~~~ U. S. DEPT. OF THE INTERIOR ti-,~v~3 <br />a OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT <br />~,geH;-;a.9 ~ Mine-Site Evaluation Inspection Report <br />1. Permitree/Person <br />j WYOMING FUEL CO. <br />2. Address <br />14300 HIGHWAY 12 <br />3. City 4. State <br />WESTON CO <br />S. Zip Cade 6. Phone Number <br />81091 -~ 719-868-2761 <br />7. Operator if Different than Pemtittee <br /> <br />8. Mine Name <br />NEW ELK <br />9. Permit Number !0. Type <br />a. Permit b. RA <br /> C-012-81 PP <br />11. Inspection Date 12. Inspection Type 13. joint Inspection <br /> 03/22/93 OF2 ~ YiN <br />YM - DD - n' <br />14. Permit Status <br />15. Site Status <br />16. Facility Type <br />A~ ~ BEFG <br />17. OSM Office # 18. RSI # 19. Land Code <br />020 <br />20. M.S.H.A. ID # 21. State Code 22. County Code <br /> 05-00296 ~ 0 0 <br />23. AVS Permittee En tity ID Number <br /> 103972 <br />24. Performance Standard Categories <br />n. administrative <br />1._ Mining within Valid Perrni[ <br />2._ Mining within Bonded Area <br />3. Terms & Conditions of Permit <br />4._ Liability Insurance <br />5._ Ownership and Control <br />6._ Temporary Cessation <br />B. Hydrologic Balance <br />i._ Chainage Controi <br />2 - Inspections & Certifications <br />3. 2 Siltation Structures <br />4._ Discharge Swc[ures <br />S. Diversions <br />ti. Effiuent Limits <br />7._ Ground Water Monitoring <br />8._ Stu{ace Water Monitoring <br />9._ Dcainage -- Acid-Toxic Materials <br />10._ lmpoundments <br />11. Stream BuCCerZones <br />C. Topsoil & Subsoil <br />I. _Removal <br />2. Substi[ute Materials <br />3. _Storage and Protection <br />4. Redistribution <br />D. BackfiBing & Grading <br />1. Exposed Openings <br />2. _Contemporaneous Reclamation <br />3. _Approzimate Original Contour <br />4. _Highwall Elimination <br />5. _Steep Slopes (includes downslope) <br />6. _Handling of Acid r& Toxic Materials <br />7. _Stabilization (rills and gullies) <br />E. Excess Spoil Disposal <br />1. Placement <br />2. Drainage Control <br />~ <br />3. Surface Stabilisation <br />4. _Inspec[ions & Certifications <br />F. Coal Mine Waste <br />(Refuse Piles/Impoundmeots) <br />1. Drainage Control <br />2. Surface Stabilisation <br />3 Placement <br />4._Inspections and Certifications <br />5._Impounding Structures <br />G. Use Of Explosives <br />1. Blaster Certification <br />2._Distance Prohibitions <br />3.~BIas[ Survey/Schedule <br />4._Warnings & Records <br />5._Conrrol of Adverse Effects <br />H. -Subsidence Control Plan <br />I. Roads <br />1. Road Construction <br />2. Certification <br />3._Drainage <br />4._Surfacing and Maintenance <br />5. Reclamation <br />J. Sigtrs & Markers <br />1._Signs <br />2._Markers <br />K. -Distance Probibitioos <br />L. Revegetation <br />1._Vegetative Cover <br />-Timing <br />M._Postmining Land Use <br />N. Other <br />it <br />~i <br />.. <br />'.I <br />~t <br />li <br />l1 <br />25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br />a Rare at Last a. Total <br />Stale Complete <br />Irtspedwn / / 0.5 a. Permit Review 153.0 bO°d~ 4123.0 <br />Frequency for previous 4 Calendar Qtrs b. Phase I a Permitted <br />D. Number of Number of 3.0 b. Inspection Tvne 0.0 released <br />requeed ^ mmpiete ^ 153.0 b. Disntrbed <br />dons 0mn~tl auaeG 0 c. Phase ^ (Estimated) <br />e Numheraf Numberot 1'2 c. Travel Time 0.0 released <br />~w~ ~ mrdud d a 1.U d. Report Writing 0,0 d. Phan Page 1 of <br />