My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE33276
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE33276
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:50 PM
Creation date
11/21/2007 1:42:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Enforcement
Doc Date
3/25/1992
Doc Name
PROPOSED SETTLEMENT AGREEMENT & Letter
From
MLRD
To
ENERGY FUELS COAL INC
Violation No.
CV1991033
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St.. Roam 215 <br />Denver, CO 80203 <br />303 666-3567 <br />RA x: 303 632-8106 <br />SETTLEMENT AGREEMENT <br />Cessation Order No. n/a Notice of Violation No. C-91-033 <br />Mine Name: Southfield Mine Permit No.: C-81-014 <br />Permittee: Allen S. Weaver, Energy Fuels Coal Inc. <br />Mailing Address: P.O. Box 449 <br />Florence, CO 81226 <br />Operator <br />(If Other than Permittee): <br />Mailing Address: <br />County: Fremont Type of Mine: Underground/Private <br />(Q~~a <br />~ /9 !6 <br />Roy Ramer. <br />Governor <br />Michael 6. Long. <br />Division Director <br />The Mined Land Reclamation Division ("the Division") issued a certain Notice <br />of Proposed Amount of Civil Penalty, and the operator requested a conference <br />thereon, as authorized by C.R.S. 1973, 34-33-123(8). The requested conference <br />having been held as required by law, on March 10, 1992, the Division and the <br />operator hereby agree as follows: <br />1. The amount of the penalty shall be 8750.00; <br />2. The penalty shall be paid to the Division by the operator not later <br />than 30 days from the date hereof; <br />3. Payment of such penalty by the operator shall constitute a waiver <br />of all further rights to review of such penalty or of the violation <br />on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten <br />days after the closing date of such conference. The ten day period shall <br />commence upon receipt of the settlement agreement by the operator. If not so <br />signed, the Division will fix the penalty at whatever amount it deems <br />appropriate, based upon the factors referred to in C.R.S. 1973, <br />34-33-123(8)(d). <br />DATE: <br />OPERATOR <br />By <br />DIVISION F MINED LAND RECLAMATION <br />DATE: ;/ : - /~; , gy ~.~ ~, ~. '-'~w~`:~-~ <br />Conference Officer <br />Penalty Adjustment Reviewed <br />CRule 5.04.3(4)(c)] <br />C.R.S. 34-33-123(8>(c)(d> <br />By <br />Division Director <br />DTM/ern <br />2153E <br />
The URL can be used to link to this page
Your browser does not support the video tag.