Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 21.5 I+~~~~ <br />Denver, Colorado 80203 I <br />Phone: (3071 866-3567 <br />FAX: 17031832-8106 <br />DEPARTMENT OF <br />EXTENSION OF TIME FOR ABATEMENT NOTICE NATURAL <br />FOR NOTICE OF VIOLATION OR CESSATION ORDER FOR COAL OPERATION RESOURCES <br />TO: THE OPERATOR AND PERMITTEE OF THE MINE DESCRIBED BELOW <br />CESSATION ORDER NO.: N/A <br />DATE ISSUED: October 16, 1995 <br />PERMIT NO.: C-82-057 <br />TYPE OF MINE: Surface/Federal <br />OPERATOR (IF OTHER THAN PERMITTEE): <br />MAIL ADDRESS: <br />NOTICE OF VIOLATION NO.: C-95-023 <br />MINE: Seneca II-W <br />COUNTY: Routt <br />PERMITTEE: Seneca Coal Company <br />MAIL ADDRESS: P.O. Draver D <br />Elayden, Colorado 81639 <br />In a Notice of Violation No. C-95-023 <br />O , (b) Cessation Order No. ,the deadline for <br />abatement of the practice, condition or violation described below was fixed at January 14, 1996 <br />It is hereby found that the operator has failed to abate such practice, condition or violation, or can- <br />not complete abatement within the time allowed, but that such failure is not due to lack of diligence <br />on the part of the operator. The time for abatement is therefore extended to March 9. 194} <br />The conditions, practices or violations to which this extension applies are as follows: <br />Field implementation of plans approved in technical revision, followin); final <br />approval of the revision by DMG. <br />DIVISION OF ERALS AND GEOLOGY <br />BY <br />(Signature f Aut orized Re sentative) <br />\3841 (5/95) <br />Date of Issue: December 9 1 q96 <br />Michael B. Long, Director <br />(Please Print Name and Title) <br />WHITE -File YELLOW -Operator PINK -Specialist <br />