My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE33255
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE33255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:49 PM
Creation date
11/21/2007 1:41:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
10/7/1992
Doc Name
FAX COVER
From
DMG
To
DEAN MASSEY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10. The third party sampling contractor shall document its compliance with <br />the approved TR-006 protocol. <br />D. Reports <br />1. A summary report will be prepared subsequent to the cpmpletion of <br />each sampling event and the receipt of the analytical results from the <br />chosen laboratory. <br />• <br />2. The summary reports will include a summary of the sampling activities, <br />sampling observation documentation, "chain of custody" dowmentation, <br />the verbatim analytical results from the laboratory, with comments on <br />unusual or unexpected results, and recommendations for minor <br />sampling changes, if indicated by the analytical results. <br />E. Malysis o[ Samples <br />1. Samples collected hereunder shall be analyzed by the independent <br />analytical laboratory designated by DMG for the following parameters: <br />Total Cyanide, WAD Cyanide and Copper in accordance with the <br />approved analytical protocol set forth in T'R No. 006. <br />2. In accordance with the approved TR No. 006 protocol, "fifrld blanks", <br />"rinse blanks", and "duplicate samples" will be submitted for analysis by <br />the third parry sampling contractor, at the contractor's discretion, with <br />the concurrence of the DMG project manager. <br />3. If analytical interferences are suspected to exist, the third parry <br />sampling contractor may direct the analytical laboratory rto perform <br />analysis for additional parameters, with the concurrence of the DMG <br />project manager, after notification of BMRI. <br />F. Submittal of Invoices <br />1. The Contract for Environmental Sampling Services rewires that <br />invoices be submitted to DMG's project manager. <br />2. The DMG project manager shall review and approve the invoice(s), <br />and return said invoice(s) to the third party sampling contractor with <br />comments for possible revision. <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.