Laserfiche WebLink
Exhibit "L" <br />Reclamation Costs <br />No reclamation costs aze proposed for this operation since the only reclamation outside the <br />stream bed would be to slope the gully walls at 3H:1 V. As evidenced by this application, <br />that would be a redundant exercise for this applicant. The attached pictures show the vertical <br />arroyo walls and their floor. <br /> <br />