Laserfiche WebLink
Exhibit "G" <br />(1) Since this is strictly a dry pit operation, no surface or groundwater shall be required. <br />(2) Since this operation will not affect surface or groundwater systems, items (a) (b) and (c) aze not <br />necessary for this application. However, the following information is being submitted as a matter <br />of course to verify this position. <br />(a) The map shows that Sand Creek is the main part of this permit acreage and the only water course. <br />Neither aze there any wells, springs or reservoirs on the affected lands or adjacent lands. <br />(b) There aze no known aquifers to be identified. <br />(c) There will be no dewatering operation involved in this operation. Sand Creek will flow through <br />the azea as it has done historically. A Stormwater Dischazge Permit and associated Stormwater <br />Management Plan (S WMP) will be developed for the operation. <br />(3) There will be no water requirements as stated previously for the development, mining and <br />. reclamation phases of this operation. <br />(4) As stated above, no water will be required or involved so there are no sources of supply. <br />(5) The applicant will not be acquiring a 404 National Pollutant Dischazge Elimination System <br />Permit since there will be no discharge. A letter from the Corps of Engineers has confirmed the lack <br />of necessity for said permit <br /> <br />