My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-11-21_REVISION - M1978323
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978323
>
2006-11-21_REVISION - M1978323
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:39 AM
Creation date
11/21/2007 1:39:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978323
IBM Index Class Name
Revision
Doc Date
11/21/2006
Doc Name
Notice of F/W Increase
From
DRMS grm
To
Parkerson Construction
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />~~,~~~, <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />~Ct- <br />SAFETY <br />Bill Owens <br />Governor <br />lVOVember 21, 2006 ~ Russell George <br />Executive Director <br />Allen Parkerson Ronald W. Cottony <br />Division Director <br />Parkerson Construction Natural Resource Trustee <br />710 S. 15th Street <br />Grand Junction, Colorado 81501 <br />Re: Woodring Pit, PermltNo.lYl-1978-323, Reclamation Liability Update-2006, Notice ofFinancia! <br />Warranty Increase SI-02. ~/ <br />Dear Mr. Parkerson: <br />In an effort to ensure the financial warranty remains adequate to reclaim this site per the requirements of <br />the approved reclamation plan, DRMS has updated the reclamation cost estimate (copy enclosed). <br />Please review the enclosed figures as soon as possible and contact our office if any calculation errors are <br />noted. <br />The last recalculation was in 2000, staff used the accepted tasks and volumes from the last recalculation. <br />The exception was staff calculated the costs of moving overburden with a loader and spreading with a <br />dozer as in the old estimate and moving the materials with scrapers and doing final grading with a grader <br />on the pit floor. It was more economical and saved time to use scrapers and a grader. A review of the <br />update shows increases due to inflation, in seed costs, mobilization and some overhead. Therefore, the <br />new reclamation liability is now estimated at $87,803.00. This is an increase of $10,982.00. Clearly, <br />the site is currently under-bonded. Therefore, pursuant to Section 34-32.5-117(4) of the Colorado <br />Land Reclamation Act, adequate financial warranty must be submitted to DMG within 60 days of <br />the mailing date of this report. Parkerson Construction may submit a rider to the current $76,821.00 <br />held by the Division or submit a new bond in the entire amount. Questions regarding bond forms and <br />submittal of the bonding documents should be directed to Elizabeth Shelton in our Denver Office at the <br />address noted above. You may contact Ms. Shelton by phone at 303-866-4084 as well. <br />If you need additional information, please contact me at the Division of Reclamation, Mining and <br />Safety, Grand Junction Field Office, 101 South Third Street, Room 301, Grand Junction, Colorado <br />81501, telephone no. 970-241-1117 <br />Sincerely <br />Division at ~ ~ ''inn. <br />G. Russell Means Mining and Safety <br />Environmental Protection Specialist <br />Office of Office of <br />Mined Land Reclamation Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.