My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE33176
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE33176
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:47 PM
Creation date
11/21/2007 1:39:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Enforcement
Doc Date
6/1/1993
Doc Name
ENERGY FUELS MINING CO RATON CREEK MINE PN C-82-055 ABATEMENT RESPONSE PART III FOR NOV C-93-52
From
ACZ INC
To
MLR
Violation No.
CV1993048
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENERGY FUELS MINING COMPANY <br />BATON CREEK MINES <br />NOV ABATEMENT RESPONSES (PART II) <br />MAY 1993 <br />NOV C-938 - Failure to obtain approval, prior to construction, of certain structures forma <br />on-site. <br />Abatement Step 9 • Submit a TR for the existing powerline light use road as identified in 7R•06 <br />Response: Field surveys of the subject road and intersecting ditch indicate that the high point <br />of the road effectively segregates both ditch flow and drainage from the upper part of the road <br />from the refuse pile area. The only portion of the road which could possibly drain to the refuse <br />pile is the lower 50 feet of the road. Limited road slope and some natural vegetative <br />reestablishment combine to limit potential runoff effects. A technical revision for this road is <br />not necessary since the road is shown on existing permit maps and was discussed in the permit <br />text (refer to page 425) in conjunction with TR-06 rubmitted in April 1990. <br />NOV C-93-52 -Failure to properly install sections of approved upland diversions. <br />Abatement Steps 1.3 - 1J Install approved section of diversion, and, 2J Reconstruct portion of <br />diversion to drain into permanent watershed diversion as approved, or, 3J Submit a technical <br />revision to redesign diversions around substation area to re/lect existing site conditions and provide <br />a revised Map 11 co show southern diversion location and sections relative to approved desigrt~ as <br />done for northern diversion. <br />Response: Field inspection, and review of existing drainage designs have rerulted in redesign <br />of the overall drainage configuration for this area to more effectively address both disturbed and <br />undisturbed area drainage within the constraints of actual site configuration. <br />Design information for existing Watershed Diversion 3 waz found to be incomplete az presented <br />in the permit appliation document. Design information for this diversion has been expanded <br />to address applicable design requirements. Two new diversion/collection ditches, Watershed <br />Diversion 4 and Yazd Area Ditch 2, have been added and corresponding hydrologic and <br />hydraulic designs have been completed. The new or revised ditch design information <br />accompanies these responses for insertion or replacement in the permit appliation document. <br />The revised drainage configuration for the rubjett area is shown on the drab of Map 12, <br />previously rubmitted with the abatement responses for NOV's C-93-46 and C-93-48 in early <br />May. Following OMLR review and comment, Map 12 will be revised if necessary and a final <br />certified map will be submitted consistent with the corresponding abatement date of June 25, <br />1993. <br />A:V56TRWASP <br />Of/S7/9) ]pm <br />
The URL can be used to link to this page
Your browser does not support the video tag.