My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE33117
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE33117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:46 PM
Creation date
11/21/2007 1:37:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Enforcement
Doc Date
11/18/2002
Doc Name
Letter regarding abatement step 1a
From
J.E. Stover & Associates
To
DMG
Violation No.
CV2002019
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES <br />2768 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />November 13, 2002 <br />Dan Mathews <br />Division of Minerals and Geology <br />101 South 3rd Suite 301 <br />Grand Junction, CO 81501 <br />Re: Snowcap Coal Company <br />Notice of Violation CV-2002-019 <br />Permit C-81-041 <br />Dear Mr. Mathews: <br />RECEIVE® <br />NOV 1 ~ 2002 <br />Division of Minerals and Geology <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />CV-2002-19 abatement step 1 a requires, among other items, the elimination of a <br />temporary road segment located at the roadside borrow area. The Operator indicated the <br />light use road segment will be removed after seeding is accomplished in the technical <br />revision cover letter that addressed the notice of violation. Abatement item 2 requires <br />implementation and completion of plans specified in the technical revision within 20 days <br />of final approval of the technical revision which is November 14, 2002. <br />Since seeding is scheduled to occur as soon as weather permits, and the road segment <br />is to be used by the seeding contractor, please amend the referenced notice of violation <br />so elimination of the road segment is not required. The Operator will eliminate the road <br />segment after use by the seeding contractor. Alternatively, the abatement deadline for the <br />notice of violation could be extended. Please let me know if either. of these-options is <br />feasible. <br />Sincerely, <br />J. E. Stover, P.E, <br />Consulting Engineer <br />C,c '..~enVz ~: - <br />- _. ...~. <br />i, ~„ <br />
The URL can be used to link to this page
Your browser does not support the video tag.