Laserfiche WebLink
<br /> <br />Extraordinary Measures <br />Colowyo called as soon as possible to notify the Division of <br />the storm and related damages. Colowyo immediately met with <br />the State Highway Department and private landowner arranging <br />for and following to completion, to their satisfaction, all <br />repairs necessary. Colowyo personnel worked long hours and <br />spared no expense in responding to this incident. <br />Abatement achieved in shortest time possible <br />Despite the fact that April was one of the wettest months on <br />record for this area and May was also extremely wet, Colowyo <br />repaired the ditch in 3 days. <br />I conclude that Colowyo took extraordinary measures to abate the <br />NOV and that it was abated in the shortest time possible. <br />Settlement Agreement Penalty Proposed $500.00 <br />