Laserfiche WebLink
CIRCES Cost Estimating Software <br />Agency or organization name : OMG <br />Task#: 007 State: Colorado PermNjob #: M-1991-054 <br />Dale: 02/192002 County: 5aguache Abbreviation: none <br />User: RCO Site: Frolitt Mine Filename: M054-0O7 <br />Pertni[ or other job action :Bond Review <br />Task description :Haul reclan <br />-RANSPORT RIG COST Shift basis: 1 par day <br />Cost data source: CRG Defa <br />Truck tractor description :Generic on-highway truck bactw 6x4, diesel powered, 400 HP <br />Truck trailer desciption : Generk /okling gooseneck, drop deck epuipmenf trailer (25T, SoT, end 90T) <br />Available rig wpaci[ies: 0-25 Tons 28-50 Tons 51t Tons <br />Cost Breakdown: Ownership cosVhoun $24.23 $28.32 $30.84 <br />Opeating cosUhour: E3025 $32.95 $34.62 <br />Operator cosUhour'. E26.59 $26.54 $26.54 <br />Helper cosVhaur: E22.70 $22.70 $22.70 <br />Total Unit CosVhouc $103.71 $11050 $114.69 <br />._.-.,_ _, a~ <br />NON-ROADABLE EQUIPM ENT <br />Machine <br />Oescrip9on Weight/unR <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />CosUhr/unit Fleet Size <br />(NO. ands) Haul Trip <br />Gostlhr/fleai Return Trip <br />CosVhrHleet OOT permit <br />CosVflee[ <br />-Cat QSD Sales 3-SP 10.78 $12.09 $103.71 1 $115.80 8103)1 80.00 <br />-CAT 4468 6ackhce Bader 9.80 $1256 $103.71 1 $116.27 $103.71 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: 5231.06 3201.42 50.00 <br /> <br />ROADABLE EQUIPMENT <br />Machine Total Fleet Size Haul Trip <br />Descripti9n CosVhour/unit (NO. units) CosVhrttleet <br />RMUm Tnp <br />GosVhrMeet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: 50.00 50.00 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or [own vnthin project area region : 5aguache, Co <br />Transportation CVde Time: Non- Total one-way travel distance: 25.0 miles <br />Roatlable Roadable Average travel speed: 15.0 mph <br />Haul tlme (hours) = f 67 1.67 Total non-roatlable mobltlemob cost': $1,92907 <br />Reurn Gma(hours)= 1.67 1.67 'nva rare raps wtm naW dg <br />Loading brae (hours) = 0.50 NA Total roadable mob/demob cost": $0.00 <br />Unloading time (hours)= 050 NA gone roundftlp, no haJ ng <br />Subtotals= 4.33 3.33 <br />)B TIME ANO COST Total job time: 8.67 hours <br />Total job cost: $1,929 <br />