My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE32958
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE32958
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:41 PM
Creation date
11/21/2007 1:34:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
4/1/1992
Doc Name
TAILINGS PH ADJUSTMENT SYSTEM OPERATIONS REVIEW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ • • <br />1 SECTION 5.0 <br />EQUIPMENT DESCRIPTION <br />5.1 pH ADJIISTMENT TANK (04-TR-09) <br />The tank is constructed of steel and lined wii~h rubber to <br />resist abrasion. The tank is fitted with a co er, through <br />-~ which the four air sparge pipes are sealed. he agitator <br />shaft passes through the cover, and is sealed to it by a <br />close-fitting rubber diaphragm. A sleeve att ched to the <br />cover and surrounding the shaft extends down t the static <br />slurry level in the tank to further limit the possibility <br />` of leakage of qas. <br />5.2 CARBON BAFETY SCREEN (04-BC-10) <br />• The Carbon Safety Screen is totally enclos~d, and the <br />- enclosure vented to the Fume Scrubber via he ducting <br />system. The feed inlet pipe from the pH Adjust ent Tank to <br />the screen is sealed to the screen enclosure. O ersize from <br />_ the screen discharges via a pipe to a drum at g ound level. <br />The drum is. fitted with_a rubber lid,_through which the pipe <br />is 'seed. The screen underflow is collected in a sealed <br />~ underpan from which it flows in a pipe to he Tailings <br />Hopper. <br />5.3 TAILINGS HOPPER (04-HP-02) <br />The Tailings Hopper is covered, and all pipe enetrations <br />"' through the cover are sealed. The hopper is fi ted with an <br />overflow pipe which discharges into the Thicken r Area Sump, <br />outside the building. The sump pump 03-PP 15 returns <br />~. spillage to the thickener or to the Tailings ump Hopper. <br />i <br />{ <br />5.4 DUCTING <br />b, <br />The pH Adjustment Tank, Carbon Safety Screen <br />nd Tailings <br /> Hopper are all connected, via ductwork, t <br />Scrubber. The ductwork is constructed of fibe the Fume <br />reinforced <br />\. plastic (FRP) and all flanges are fitted with soft rubber <br /> gaskets to ens ure against leakage. <br />~ <br />,. The system may be equipped with orifice plates f required, <br /> for balancing ~ <br />of flows and pressures during co missioning. <br />I Sampling ports are provided in the ducts, both t <br />facilitate <br />. balancing and to provide access for gas sampli ~ <br />g. <br />^. <br /> pj/1480rp 012591 5-1 <br />4. <br />~. ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.