Laserfiche WebLink
:~ <br />~~~~i <br />~ • III IIIIIIIIIIIIIIII <br />MINED LAND RECLAMATION DIVISION 999 <br />STATE OF COLORADO, DEPARTMENT OF NATURAL RESOURCES <br />NOTICE OF VIOLATION NOV No. ~'-~C%-~-3~~ <br />Permit No.: ~ ~~==~ -( it :~ <br />Type of Mine: ~i.C~- ~ r~r-, ~~~ i~_ <br />Operator (If Other than Permittee): <br />Mail Address: <br />Inspector: ~~%;I!,:<<.~t h. ~ ~z. 1< <br />Mine: ~_GG l l~;d-..~ i~,G. / <br />County: ~ ~ _ '~,~ <br />Permittee: %/. <<.~::~ ~.7 .+: c:-~-rct ~) ~~r- <br />Mail Address• ~ " <br />Date/Time of Inspection: <br />T ~ I ; ~ r ~t ~; ~ iC' /-f r-i <br />Person Served: <br />Signature o person served <br />Served By: <br />Signature of authorized representative <br />of Mined Land Reclamation Division) <br />ease print name an tit a Date and Time of Service: <br />A.M <br />CERTIFIED MAIL N0. /~c~,.,:;fi J ~ jy' y~ ~ `~ ~~: <br />Return Receipt Requeste <br />The Mined Land Reclamation Division ("the Division") has conducted an inspection of <br />the above mine and has made the findings Stated in the attached schedule and has <br />found violations of the Colorado Surface Coal Mining Reclamation Act, or violations <br />of required permit conditions, listed in the attached schedule. This notice <br />constitutes a separate notice of violation for each violation listed. <br />You must abate each of these violations within the designated abatement time. <br />Where the remedial action requires submission of plans, the plans are to be <br />submitted to the Division within the designated time. You are responsible for <br />doing all work in a safe manner in compliance with all applicable laws and <br />regulations. <br />The undersigned finds that cessation of mining is is not X expressly, or in <br />practical effect, required by this notice. For this purpose, "mining" means <br />extracting coal from the earth or from a waste pile and transporting it within or <br />from the mine site. <br />C.R.S. 1973, 34-33-123(13) provides for imposition of civil penalties of up to <br />b5,000 for each violation and provides that each day of continuing violation may be <br />deemed a separate violation. <br />Important: Please read the reverse side of this page. <br />