Laserfiche WebLink
' NOV-GB-'6? 15:58 ID:CO M1NED LRNU REC'L TEL N0:303-E32-B1E~6 tt4E8 P06 <br /> <br /> <br />1 <br /> <br />~I <br /> <br /> <br /> <br /> <br /> <br />1 <br />Mr. Gordon Morgan - 5 - November 7, 1989 <br />Financial Warranty (continued) <br />e. The erosion protection methods to be implemented below the new culvert <br />crossings, including location of material source areas. If constructed <br />channels will be used to convey culvert outflows to the stream channel, <br />then channel dimensions, Construction materials and material source <br />areas should be addressed end Identified; <br />f. The amount of material to be removed at the road realignment area, and <br />the volume of material to be back filled at the old scale site. If the <br />road cut volume is Less than the required back fill volume, the location <br />and haul distance from which the deficit materiel will be obtained <br />should be addressed. <br />Please address these concerns as soon as possible so that we may develop a final <br />Corrective Ac ti an Plan by November 15, 1989. Do not hesitate to call me 1f we can <br />be of ar1Y further assistance. <br />Sincerely, <br />C/!J` ~y ~i~~~ILLt <br />Daniel I. Hernandez <br />Reclamation Specialist <br />DIH/ern <br />cc; Bruce Humphries <br />' 0998E <br />1 <br />1 <br />