Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />PRELIMINARY <br />CULVERT DESIGNS <br />SNYDER QUARRY <br />ACCESS ROAD <br />' CORRECTIVE ACTION PLAN (CAP) <br />The following six culvert systems have been preliminarily <br />designed to accommodate storm water from a qaa design <br />storm. The systems are sub)ect to regulatory approval and <br />site specific final design considerations relative to elevations <br />and subsurface soils conditions. All construction is to be in <br />accordance with pertinent Colorado Department of Highways <br />Standards and Specifications. <br />