<br />1 <br />' D. OTHER CONCERNS <br />ITEM NO. 21 RESPONSE: The Operator agrees to limit our work in the <br />corrective actions to the limits of the existing disturbances, with the <br />exceptions you have stated in your letter. <br />' ITEM NO. 22 RESPONSE: The Boundary Modification Table on Page 21 is <br />hereby revised in part to read as follows: <br />' Description Area(AC) Comments <br />B-3: Area 5 (Replaces 6) 0.70 Contains A-5 (Replaces 6) <br />from Access Road Downhill <br />' E. FINANCIAL WARRANTY <br />' ITEM NO. 23 RESPONSE: The following response is provided for <br />consideration relative to financial warranty for Items included in the C'AP. <br />a. We cannot provide a volume figure Por the amount of material to be <br />' moved because there is no way to obtain that information without <br />extensive remapping oP the entire site. Also, because at major x~ork <br />locations (Areas 1 and 4) we do not know what the "natural" <br />' topography is like under the pile, there is no way to calcu.~ate <br />accurately the volume of material to be moved iP it's depth is <br />indefinite. We are sorry, but this information simply cannot be <br />' obtained to the degree of accuracy you apparently require. <br />Our plan, as stated in the Corrective Action Plan, is to usc~ as <br />much of the material removed from one area for filling adjacent areas. <br />' This is the only economical way to proceed. Thus, most of the fill <br />for Area 1 will come from Area 4. Any excess material from area 4 <br />will be hauled to the quarry for processing Into aggregate. Area 4 <br />' was constructed using material that was only partly waste r~~ck. <br />There is a considerable amount of crushable rock present in the fill <br />and this can be easily processed into aggregate. The remains of this <br />reprocessing will be disposed oP as normal limestone waste. <br />' b. The soil stockpiles that will be used as the source Por the soil are <br />about 1/4 mile away from the sites. <br />' c. The silt retention facility will be constructed by cutting and fillin,~ of <br />native materials Pound at the site. The same is the case for the <br />' channel at the toe of Area 1, no other channel construction is <br />required. <br />d. There is no may we can provide this information. To provide Lhis <br />' information would require the pond already be designed. This will _ <br /> <br />10 <br />1 <br />