Laserfiche WebLink
TABLE L -RECLAMATION COST ESTIMATE <br />$294,914 <br />Reclamation costs <br /> unit <br />measure t2uan <br />/If If total <br />units $/unit cos[ <br />A-A rtion <br />com acted cla & ob car. Yds. 24 2900 69600 1.25 87000 <br />com acted ob (bank cu. Yds. 5.1 2900 14790 1.25 18487 <br />Com acted clay ar. Yds. 34 2900 98600 1.25 123250 <br />to soil cu. Yds. 4 2900 11600 0.5 5800 <br /> <br />rock for tce drain ar. Yds. 0.33 2900 957 0.5 478.5 <br />drain pipe ft. 1 2900 2900 2.9 8410 mat 1.7 lab <br />1.2 <br />area to seed .ft. 70 2900 203000 0.0046 934 <br /> <br />Total cost lined rtion $244,359 <br />cost er foot lined $84.26 <br /> <br /> <br />unlined rtion <br />compacted clay <br />com acted cla & ob cu. Yds. 8 <br />4.75 2000 <br />2000 16000 <br />9500 1.25 <br />1.25 20000 <br />l 1875 <br />com cted ob k a. Yds. 3.4 2000 6800 1.25 8500 <br />to soil cu. Yds. 2.4 2000 4800 0.75 3600 <br />rock for tce drain cu. Yds. 0.33 2000 660 0.5 330 <br />drain i ft. 1 2000 2000 2.9 580(1 <br />seeded area .8. 49 2000 98000 0.0046 451 <br /> <br />total cost unlined 'on $50,556 <br />cost er foot unlined $25.28 <br /> <br /> <br /> <br />Total reclamation cost $294,914 <br />RECEI!/EC <br />MAY 0 62003 <br />Division of Minerais and Gzology <br />