Laserfiche WebLink
(3h(~ <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (:303) 866-3581 <br />FAX (303) 866-3589 <br />STATE OF COLORADO <br />E® °f.~o <br />Rte, ° `'104 <br />MAY 2 7 2003 ~y' ` °'~ <br />D1vlSiafl of Minerals and Geology *k µ~•t <br />www.water.state.co.us <br />Response to Reclamation Permit Application Consideration <br />DATE: May 27, 2003 <br />TO: Harry H. Posey, Senior Environmental Protection Specialist <br />CC: Division 2 Office; Distr}ct 67 Water Commissioner <br />FROM: Don West, P.E. <br />RE: No. 2 Pit, File No, M-1983-106 <br />Operator: Cheyenne County, <br />Contact: Carl Randel <br />Section 22, Twp 145, Rng SOW, 6th P.M., Cheyenne County <br />Bill Owens <br />Governor <br />Greg E Wakher <br />Executive Director <br />Hal D. Simpwn, P.E. <br />Stale Engineer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />® Other: Applicant states that stormwater will be contained on-site. All ponded stormwater must be <br />released to the natural stream system within 72 hours, or all work must cease until a substitute water <br />supply plan, or augmentation plan approved by water court, is obtained. Reclamation plans must <br />ensure water will not be retained onsite for more than 72 hours unless an augmentation plan <br />approved by water court is obtained. <br />COMMENTS: <br />Permit #:~ ~ 2 ^1 Confidental?: <br />Type-Seq.: <br />Class: To: ~ yyl~,,~~~~~ -__ <br />From: <br />Doc. Name ~ 'O ' ----- -- <br />3f no date stamp): a~'~O ~ <br />Doc. Date (' <br />