Laserfiche WebLink
<br />• Page three <br />While Basin can generally predict the time frames and magnitude of <br />planned subsidence, the specific geologic conditions encountered will <br />determine the precise timing and extent. Homes built prior to mining, <br />without protective measures to minimize the effects of subsidence, can be <br />severely damaged. We acknowledge that we have responsibility for <br />mitigating damages to homes caused by subsidence from our mining <br />operations, and we ask that you contact us if you have built or plan to <br />build a home, so that protective and corrective measures may be utilized <br />to minimize such damage. <br />If you have any questions regarding this letter, or the effects of <br />mining beneath your property, please contact me directly at Basin at <br />(719) 868-2761. <br />Yours very truly, <br />Earl R. White ~/"~ <br />President and General Manager <br />cc: Jeffrey H. Desautels, Esq. (303) 297-4541 <br />• <br />• <br />