Laserfiche WebLink
.- -. <br />still raining on and off when you arrived for your inspection. <br />Because of the heavy rain the pond elevation raised enough to begin <br />discharging over the road to the pump pad location again. We <br />managed to get some equipment down to the site of the problem the <br />morning of the 12th and did berm off the road so no further <br />discharge would occur over that site. This coupled with a <br />temporary diversion ditch placed on the haul road above the pond <br />location is all that we have been able to accomplish to date due to <br />wet conditions. We have secured a lease on a small bulldozer in <br />order to repair the area affected by the run off from the pump pad <br />area. <br />Should you have any questions regarding this matter, contact me at <br />the mine site. <br />Sincerely, <br />David Beverlin <br />Resident Engineer <br />