Laserfiche WebLink
BLUE <br />MOUNTAIN August 5, 2002 <br />ENERGY, INC. <br />ASubsi&my of <br />ne.~,cr cmerafion ~ <br />rmrsm:+son ceepnofire Mr, Dan Mathews <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Request for an extension of time to abate item #1 ofNOV CV-2002-016. <br />Dear Dan: <br />Blue Mountain Energy, Inc. requests an extension in the time to abate the requirement to <br />"complete temporary refuse stockpile removal and grading as necessary to eliminate <br />depression on surface of refuse pile...". We have been actively moving the temporary <br />pile on a 2 shi8s per day - 6 days per week schedule and wiil continue to do so until <br />complete. We may be able to complete the task as requested in the allotted time but <br />scheduling will be close. To avoid missing a deadline we are therefor requesting this <br />extension. We are currently operating without any depressions at the present time but <br />will need to excavate into the footprint of the pile for final spreading and compaction. <br />Subsequently creating very short-term depressions. <br />We should be able to complete the tasks no later than August 30~'. <br />Sincerely, <br />~ ~,. <br />Scott Wanstedt <br />Environmental Engineer <br />3607 County RD N65 <br />Reugely, CO 51648 <br />970fi75-0300 <br />Fax 970b75-0399 <br />