My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-10-27_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-10-27_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:50 PM
Creation date
11/21/2007 1:31:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/27/2003
Doc Name
Weekly Construction Report
From
CC&V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />_ ~Wllil~l <br />1~SOC~c'1tC'S <br />October 17, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State FIighway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303)985-2080 <br />Golder Project No.: 003-2203 <br />I2E: Summary No. 33: September 28 through October 17, 2003 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of September <br />28 through October 17, 2003. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 29° F to 45° F, and highs ranged from 46° F to 78° F. Precipitation in the <br />form of rain or snow was reported on five days of this reporting period. Weather observations were <br />made on eighteen days of this twenty-day reporting period. <br />Constnuction S n~opsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase Nb <br />construction. Ames conducted Phase IVh construction activities on nineteen days of this twenty-day <br />reporting period (September 29 through October 17). Poly-Flex conducted Phase Nb constmction <br />activities on sixteen days ofthis twenty-day reporting period (September 29 through October 14). <br />Phase IVb <br />Ames continued excavation of the Phase IVb OSA geomembrane anchor trench at the Phase N b/c tie- <br />in azea, and along the west end berm, excavating approximately 50 lineaz feet of anchor trench in <br />preparation for geomembrane placement and anchor trench backfill. Ames completed backfill and <br />compaction of Phase IVb OSA geomembrane anchor trench at the Phase IV b/c tie-in area, backfilling <br />approximately 14501ineaz feet of anchor trench. <br />Ames re-excavated and re-established the temporary surface water diversion channel between the Phase <br />IVb and Phase IVctie-in azea. <br />
The URL can be used to link to this page
Your browser does not support the video tag.