Laserfiche WebLink
~ • iiiiiiiuiiiiiu~ii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources SOY CO~4 <br />~- b <br />131 J Sherman Sr, Room 215 '" ~ o <br />Denver, CO 80203 ~.~.,;,,eh. <br />Phone (30J1865~3567 ~ra-re' <br />FAX: 0031 832-A 106 <br />Roy Romrr <br />Gnvernnr <br />M ichael8 LnnR <br />Drvrcion Uuruur <br />September 27, 1993 <br />Mr. Jack Crichton <br />American Shield Coal Company <br />Fruita No. 1 and No. 2 Mines <br />10830 N. Central Expressway, Suite 175 <br />Dallas, Texas 75231 <br />RE: Fruita ~1 and g2, (C-81-015); <br />NOV C-91-024; Board Order <br />Dear Mr. Chichton, <br />Enclosed, please find the extension of time for abatement notice <br />for NOV C-91-024 for the Fruita Mine. The time for abatement has <br />been extended until December 14, 1993. Please also note the <br />modification notice for the same violation mentioned above. The <br />modification of NOV C-91-024 changed the steps necessary to abate <br />violation to state Backfill and grade the upper bench area so the <br />highwalls are completely eliminated". Abatement is due by December <br />14, 1993. <br />Also enclosed is the Board Order issued by the Mined Land <br />Reclamation Board. This Board Order was signed on September 23, <br />1993 vacating both settlement agreements between American Shield <br />Coal Co. and the Mined Land Reclamation Board. <br />If you have any questions or need additional information, please do <br />not hesitate to call. <br />Sincerely, <br />~~ s <br />Erica S. Crosby <br />Reclamation Specialist <br />m:\coal\esc\fruit\930927 <br />Enclosure(s) <br />