Laserfiche WebLink
<br />-3- <br /> <br />The operator has paved the proposed haul road surface to protect against wind <br />and water erosion. Also, material tracked onto the haulroad will be swept <br />and/or washed to minimize further tracking of material onto the State <br />Highway. Material washed from the haulroad will enter approved sediment <br />corttrot structures located along, and at the base of the proposed haulroad. <br />These include a sediment pond, and series of silt fences. , <br />Please note that the Moschner submittal references a revision regarding <br />expansion of the Elk Creek coal storage area. Although we are aware of such <br />plans, the Division has not received a formal application. As mentioned <br />above. Gunnison County is reviewing plans to expand the yard area. <br />The technical revision submittal complies with all regulations pertinent to <br />haul road construction and use. It is also our opinion that the air quality <br />protection provisions of the Coai Regulations have been adequately addressed. <br />CC: Randy Price <br />Steve Renner <br />Linda White <br />Dean Massey <br />9290f/scg <br />