My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-07-19_REVISION - M1996008
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1996008
>
2006-07-19_REVISION - M1996008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:42 AM
Creation date
11/21/2007 1:27:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996008
IBM Index Class Name
Revision
Doc Date
7/19/2006
Doc Name
Epriodical Financial Warranty Review Increase Notice
From
DMG
To
Western Gravel Inc.
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />SCRAPER-ONLY WORK <br />Task # <br />Date <br />User <br />Agency or organization name :OMG <br />04a State :Colorado <br />07/19/2006 County:Montrose <br />GRM <br />Permit or other job action :Periodical Update - 2006 <br />Task descdption :haul topsoil from W stockpiles to Phase 1 <br />HOURLY EQUIPMENT COST <br />Model:Cat 623G <br />Shift basis : 1 per day <br />Cost Breakdown : Job utilization % Horsepower : 365 <br />Ownership cosUhour : $67.15 NA Weight (UST) : 40.92 <br />Operating cosf/hour : $91.22 100 Cost data source : (CRG) <br />Operator cosUhour : $24.95 NA <br />Total unit cost/hour : $183.32 Total fleet cosUhour : $183.32 <br />-.: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 3,294 CCY factor : 1.125 volume: 3,706 LCY <br /> <br />Source of quantity take-off :approved plans /accepted volumes <br />Source of estimated swell factor <br />.. <br />- <br />m _ .~ :program <br />. <br />_ <br />.~ <br />~~m^}-..,.......__. <br />- .. .. <br />._.. _...... .. <br />............. , <br />..~._-' „_ <br />. <br />HOURLY <br />PRODUCTION . _ __._, _ _ ..__. ..,,. _. <br />. ____„ ... <br />Haulino Capacity <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight : 2,550 pounds/LCY Struck volume : 18.00 LCY <br />Material description : Heaped volume : 23.00 LCY <br />Earth -Dry packed Average volume : 20.50 LCY <br />Rated payload : 55,000 pounds <br />Payload capacity : 21.57 LCY Adjusted capacity : 20.50 LCY "' <br /> <br />Cycle Time (load + haul + spread + return) : Loading time : 0.90 minutes " <br /> Maneuver and spreading time : 0.70 minutes <br />Travel time : ' loaamg tlma par pair on poen-pwl modals <br />Route Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velocity (fpm) Travel time (min.) <br />Haul: 500 0.0 5.0 5.0 1,292 0.49 minutes '* <br />Return : 500 0.0 5.0 5.0 2,359 0.21 minutes " <br />"travel lime adjustetl for acceleration antl tleceleration at load antl tlomp points <br />velocities are max. attainable per total resistance shown, not average Total cycle time 2.30 minUtes <br />Job Condition Correction Factors <br />Site altitude (feet) : 5,660 Adiusted Houdv Production <br />Altitude adjustment factor : 1.00 (Cat HB) Unadjusted unit production : 535.12 LCY/Hour"' <br />Job effciency factor : 0.83 (1 shift/day) Adjusted unit production : 444.15 LCY/Hour <br /> Adjusted fleet production : 444.15 LCY/Hour <br />Net job COrreC110n faCfOr : 0.83 "' 2limes volume on pusRpull models <br />JOB TIME AND COST <br />Fleet size : 1 Scraper(s) Total job lime : 8.34 Hours <br />Site :North R-34 Pit <br />Permit/job # :M-199fr008 <br />Abbreviation :none <br />Filename : M008-04a <br />Unit cost : $0.413 /LCY Total job cost : $1,530 <br />
The URL can be used to link to this page
Your browser does not support the video tag.