Laserfiche WebLink
~, <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />CosUhour/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />CosUhr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $53.79 1 $53.79 $53.79 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: $53.79 $53.79 <br />-; :, <br />_- <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Montrose <br />Transportation Cvcle Time : Non- Total one-way travel distance : 5.0 miles <br />Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.14 0.14 Total non-roadable mob/demob cost ` : $273.72 <br />Reium time (hours) = 0.14 0.14 `lwo round trips vnth haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost " : $15.37 <br />Unloading time (hours) = 0.50 NA "one round tdp, no haul rig <br />Subtotals = 1.29 0.29 <br /> <br />JOB TIME AND COST Total job time : 2.57 hours <br /> Total job cost : $289 <br />