Laserfiche WebLink
ROADABLE EQUIPMENT ~ sheet 2 of 2 <br />Machine <br />Description Total <br />CosUhour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />CosUhr/fleet <br />-Water Tanker, 3,500 Gal. $57.17 1 $57.17 $57.17 <br />-Flatbed truck, 4x2, 30K GVW $53.79 1 $53.79 $53.79 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $110.96 $110.96 <br />_. ___.__---.-.._. __-____._ __.--- _..__.. _ ,__..-~._ w <br />- ...~,~ <br />EQUIPMENT HAUL DISTANCE and TIME ----- ' _ - _ ..,___._ _ __ ...- <br /> Nearest major city or town within project area region : Montrose <br />Transportation Cvcle Time : Non- Total one-way travel distance : 5.0 miles <br /> Roadable Roadable Average travel speed : 30.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.17 0.17 Total non-roadable mob/demob cost " : $1,207.21 <br />Retum time (hours) = 0.17 0.17 `two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost " : $36.99 <br />Unloading time (hours) = 0.50 NA "one round trip, no haul dg <br />Subtotals = 1.33 0.33 <br />JOB TIME AND COST Total job time . 2.67 hours <br />Total job cost : $1,244 <br />