Laserfiche WebLink
<br />STATE OF COLORADO <br />Roy Romer, Governor <br />r ,- <br />DEPARTMENT OF NATURAL RESOURCES <br />MINED LAND RECLAMATION DIVISION <br />FRED R. BANTA, Director <br />SETTLEMENT AGREEMENT <br />Cessation Order Plo. <br />Notice of Violation No. -'o-u <br />Mine Name: Apex Coal iJo. 2 Permit No.: C-~1-011 <br />Permittee: Sunlanc; iiininq Corp. <br />Flailing Address: P.O. Box 267, Sturois, t:l' 4245S <br />Operator <br />(If Other than Permittee): <br />Mailing Address: <br />County: r~outt Type of t+line: UG/Federal <br />Th? Mined Land Reclamation Division ("the Division") issued a certain Plotice <br />of Proposed Amount of Civil Penalty, and the operator requested a conference <br />thereon, as authorized by C.R.S. 1973, 34-33-123{8 ). The requested conference <br />having been held as required by law, the Division and the operator hereby <br />agree as follows: <br />1. The amount of the penalty shall be S 500.00 ; <br />2. The penalty shall be paid to the Division by the operator not later <br />than 30 days from the date hereof; <br />3. Payment of such penalty by the operator shall constitute a •.iaiver <br />of all further rights to review of. such penalty or of the violation <br />on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten <br />days after the closing date of such conference, which date is set forth below <br />opposite the signature of the Conference Officer. If not so signed, the <br />Division will fix the penalty at whatever amount it deems appropriate, based <br />upon the factors referred to in C.R.S. 1973, 34-33-123(8)(d). <br />DATE: <br />0 R OR <br />By <br />DIVISION OF MINED LAND RECLAMATIOrI <br />DATE: Play 17, 1988 By ~1~~~ _ '~!~ <br />~~~V/' on erence O~~icer <br />C.R.S. 34-33-123(8 )(c)(d) <br />(R~a3 ~5?nial Building, 7313 Sherman Street Denver, Colorado 80203-2273 Tel. (303) 866-3567 <br />Doc. No. 5016E <br />