My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE32646
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE32646
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:32 PM
Creation date
11/21/2007 1:26:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Enforcement
Doc Date
8/11/1993
Doc Name
ECKMAN PARK 1 & 2 MINE PN C-81-071 SETTLEMENT AGREEMENT NOV C-93-080
From
DMG
To
COLO YAMPA COAL CO
Violation No.
CV1993080
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />U U Sherman SL. Room 215 <br />Denver, CO 80203 <br />Phone: U03) 866J567 <br />FAX 1303) 832 8106 <br />Cessation Order No. <br />SETTLEMENT AGREEMENT <br />Notice of Violation No. C-93-080 <br />Mine Name: Eckman Park Permit No.: C-81-071 <br />Permittee: Colorado Yampa Coal Company <br />Mailing Address: 29587 Routt County Road #27, Oak Creek, CO 80467 <br />Operator <br />(If Other than Permittee): <br />Mailing Address: <br />County: Routt Type of Mine: Surface/Federal <br />of cow <br />e y <br />„gib <br />0 <br />~ r8 i6 ~, <br />Roy Romer <br />Governor <br />M¢hael B. Long <br />Division Direuor <br />The Mined Land Reclamation Division ("the Division") issued a certain Notice <br />of Proposed Amount of Civil Penalty, and the operator requested a conference <br />thereon, as authorized by C.R.S. 1973, 34-33-123(8). The requested conference <br />having been held as required by law, on July 27, 1993, the Division and the <br />operator hereby agree as follows: <br />The amount of the penalty shall be $500.00; <br />2. The penalty shall be paid to the Division by the operator not later <br />than 30 days from the date hereof; <br />3. Payment of such penalty by the operator shall constitute a waiver <br />of all further rights to review of such penalty or of the violation <br />on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten <br />days after the closing date of such conference, which date is set forth below <br />opposite the signature of the Conference Officer. If not so signed, the <br />Division will fix the penalty at whatever amount it deems appropriate, based <br />upon the factors referred to in C.R.S. 1973, 34-33-123(8)(d>. <br />DATE: <br />OPERATOR <br />By <br />DIVISION OF MINED LANG RECLAMATION <br />DATE: ~'/D~qi By <br />Penalty Adjustment Reviewed By <br />(Rule 5.04.3(4)(c)] <br />C.R.S. 34-33-123(8)(c)(d> <br /> <br />8525E <br />SLB/scm <br />
The URL can be used to link to this page
Your browser does not support the video tag.