Laserfiche WebLink
CIRCES Cost Estlmatlno Sattware <br />EQUIPMENT MOBILIZATION I DEMOBILIZATION <br />PROJECT IDENTIFICATON <br />Agency or oryanizatlon runner Co/Oredo Division d Minerals Arq Geo/opY <br />Task: 005 State:CdaaW PemuUjob#:h1.7991.008 <br />Data: Od97/MOd Cautty:/SO &arlm Abbrevialion:nona <br />Usef: KAP Site:kYhtla River Sand6 Grew/ Filename: M008-005 <br />Pannit a oarerjob aGim :Surety Increase Due TO Inspection <br />ROADABLE EDUIPMENT <br />HaN time (hours) = 0.07 0.07 Total non-madaDle moD/tlemoD wst': E121.53 <br />Reaun lime (hours)= 00] 0.07 'rwo mum mfrs wttn NUl Dp <br />Loatlirig Limn (hours) = 0.50 NA Total roadaDle madtlemob mst ": .t.? B8 <br />Unloatlirg time (hours) = 050 NA ore mina Np. ao luul ao <br />JOB PME AND COST Tatel loD time: T.Y7 Mura <br />Total joD mst: 5725 <br />Nearest major dry or town within project area region : Meeker <br />Trensoortatian CvGe Time: Non- Teal arse-Way travel tlislance: 2.0 miles <br />Roatleble Roadable Average travel speed : 30.0 mph <br />