My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE32632
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE32632
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:32 PM
Creation date
11/21/2007 1:26:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
4/5/1992
Doc Name
TECHNICAL REPORT AND PROPOSAL CYANIDE DETOXIFICATION AT SAN LUIS RESPONSE TO 03-31-92 NOPV PRELIMINA
From
MLRD
To
LARRY D OEHLER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Battle Mountain Gold <br />Notice of Probable Violation <br />Abatement Requirements <br />(Permit No: M-88-112) <br />As abatement for the Notice of Probable Violation issued to Battle ~ountain <br />Gold (BMG) on March 31, 1992, the Division imposes the following pe formance <br />requirements. <br />(1) Immediate Increased Tailings Area Security: <br />BMG shall develop and implement a Tailings Area Security progr m, in <br />order to safe guard the health and safety of the general publi and <br />wildlife. The plan shall be submitted to the Division as soon as <br />possible for review and approval. In the interim, BMG shall i~plement <br />whatever increased surveillance it deems appropriate to contro the site. <br />(2) Immediate Assessment of Environmental Impact: <br />BMG shall review all available environmental monitoring data c~ilected to <br />date, including its approved ground and surface water monitors g sites, <br />air quality monitoring sites, the tailings pile leak detectionsystem, <br />the processing plant circuit, and any other applicable monitor ng <br />facilities. A report summarizing its initial findings shall b~ submitted <br />to the Division by Friday, April 10th. <br />(3) <br />Accelerated Frequency of Environmental Monitoring: <br />The frequency of monitoring of the environmental monitoring facilities <br />referenced in item (2) above shall be accelerated to bi-weekly, <br />commencing immediately and continuing until relaxation is appr ved by the <br />Division. The initial samples shall be submitted to an EPA ce tified <br />laboratory for "rush" analysis. Subsequent samples may be pro essed <br />normally. <br />The results of each set of sample analyses, covered <br />brief summary letter report, Shall be submitted to <br />three days following completion of the analyses by <br />(4) Tailings Cyanide Detoxification: <br />with an ap ropriate <br />the Divisio within <br />the laborat ry. <br />BMG shall develop and submit a plan for cyanide detoxification f the <br />entire slurry and liquid contents of the tailings impoundment as soon as <br />possible for review and approval by the Division. This plan sh 11 be <br />submitted as a technical revision application. This applicatio shall <br />include a schedule for implementation. Following approval of t is <br />technical revision, BMG shall implement the treatment method in <br />accordance with the plan. Appropriate frequency and distribute n of <br />monitoring of the tailings and plant circuit shall be proposed ithin <br />thew application and subsequently conducted to verify the progr ss and <br />success of the remedial treatment. Monitoring results, covered by an <br />appropriate cover letter report shall be submitted to the Divisilon weekly <br />during the detoxification program. <br />
The URL can be used to link to this page
Your browser does not support the video tag.