My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-09-20_REVISION - M1981112 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981112
>
2005-09-20_REVISION - M1981112 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:08:55 PM
Creation date
11/21/2007 1:25:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981112
IBM Index Class Name
Revision
Doc Date
9/20/2005
Doc Name
112c application - final submittal received 08/23/06
From
Builders Aggregate Co.
To
DRMS
Type & Sequence
CN2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit L <br />RECEI~!FD <br />Reclamation Costs AUG 2 3 2006 <br />Division of Reclamation, <br />Mining and Safety <br />The cost of reclamation is a difficult cost to project on a site that will remain <br />in business for many years, but the Owners submit the following information. The <br />table below tries to itemize the different steps necessary to reclaim the ground to <br />native vegetation that was originally on the site. <br />Table A -Itemize Reclamation Costs <br />Item Descri tion Quanti Unit Cost Cost <br />1 Site clean-u 10,000 c $0.50/c 5,000 <br />2 Over lot radin 36,600 c $0.40/c 14,520 <br />3 Seedin 30 ac $700/ac 21,000 <br />4 Total $40,520 <br />Note: Quantity are based the requirement to reclaim 30 ac of disturbed ground. See attached <br />current air photo. <br />As part of the current operation the Owners have posted with the State of <br />Colorado a bond with the value of $14,000. The value of the product mined is a <br />function of the material mined and although it is generally believed to be mostly <br />sands with some gravel's, the value is as yet underdetermined. The actual <br />quantities are unknown and the market conditions that set the retail value of the <br />material are unknown at this time. <br />The value of the mining equipment that has been brought and/or <br />manufactured on-site over the life of the operation is approximately $900,000.oo. <br />
The URL can be used to link to this page
Your browser does not support the video tag.