Laserfiche WebLink
POWDERHORN <br />COAL COMPANY <br />February 3, 1993 <br />Ms. Janet H. Binns <br />Reclamation Specialist <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: NOV C-92-38, File C-81-041 <br />Dear Ms. Binns: <br />III III IIIIIIIIII III <br />sss <br />a.o. eoz 1430 <br />7alisade, Colorado 61528 <br />(303) 4647951 <br />Fez (303) 464-7161 <br />~~~~8 ~~ <br />FEB 0 5199 <br />t;~;, <br />MrNER,yLS A°~. .~- <br />As discussed this morning on the phone, we are requesting an <br />extension of time for completion of rip rapping the collection <br />ditches adjacent to CRDA #1. January has been too muddy to get <br />the rip rap out of the contractor's pit and to work on the <br />ditches. We would like to request an additional 30 days to <br />install the rip rap. <br />The two (2) undocumented culverts have been removed and regrading <br />the south end of the bench #3 has been started. Progress on the <br />bench regrading has been slowed by fro9t on the north facing <br />slopes. <br />Thank you for your assistance on this extension request. <br />Sincerely, <br />~~ ~~~ <br />Larr M. Reschke <br />Engineer <br />LMR:]P <br />\- <br />cc: D. A. Jenkel, PHCC <br />W. C. Jennings, PRCC <br />